EVS Reclamation in Rubber Industry – Santo André, Brazil
Project Goals and Outcomes
Client: Rubber Industry
Location: Santo André, São Paulo State
Client’s Goal: Reduce Trichloroethylene (TCE ) concentrations detected in the unsaturated zone of the subsurface.
Our Role: Design, installation and maintenance(O&M) of the vapor extraction system.
Result: Commissioning of a safe and efficient SVE plant, integrated into an operational production environment.
Performance of the Plant
750 m³/h
Suction Power
Plant equipped with a high-efficiency blower to extract vapors from underground.
TCE
Target Contaminant
System designed to remove Trichloroethylene from the unsaturated zone
Security
LEL environmental sensors to detect explosive atmospheres and ensure site safety.
The GEOSTREAM Solution
Targeted intervention of Soil Vapour Extraction (SVE) at a major tire manufacturing plant.
- Well Field Configuration: Intervention on specific TCE contamination through a network of 8 extraction wells installed at a depth of 4 m to effectively intercept vapors in the unsaturated zone.
- Treatment Technology: Complete system with a condensate separator to protect the blower(750 m³/h) and treatment of the outgoing air with two activated carbon filters of 250 kg each, for compliance with emission limits.
- Integrated Management: In addition to supply and installation, Geostream follows the maintenance (O&M) of the plant. Operational safety is ensured by LEL sensors for continuous ambient air monitoring.