Remediation with ERD Injection – Brindisi

Brindisi-ERD-Geostream

Project Goals and Outcomes

Client: Aeronautical and aerospace company
Location: Brindisi production site
Client Goal: Reduce chlorinated solvent and Chromium [Cr(VI) and total] contamination in groundwater by organic substrate injection.
Our Role: Design and implementation of an ERD (Enhanced Reductive Dechlorination) plant with organic substrate injection in 14 wells.
Result: Chlorinated solvent concentrations lowered below risk targets approved by regulatory agencies; progressive reduction of heavy metals; full regulatory compliance.

Performance of the Plant

14 wells

Totals per substrate injection

1,5-2 m3/g.

Flow rate mixture water + organic substrate

ERD

Applied technology (reductive biodegradation stimulation)

The GEOSTREAM Solution

Injection plant for controlled mixing and distribution of organic substrate (whey) and water, designed to feed the 14 wells located on the contaminated area.
Complete system of: storage unit, mixing, injection station, hydraulic lines and parameter control instrumentation.