Home 5 Project 5 TAF Plant and ISCO Interventions – Milan

TAF Plant and ISCO Interventions – Milan

Project Goals and Outcomes

Client: CGF (real estate)
Location: Former Industrial Area – Milan
Client’s Goal: To secure chlorinated solvent-contaminated groundwater in a brownfield site slated for residential redevelopment.
Our Role: Installation of a TAF (Pump & Treat) plant integrated with potassium permanganate-based chemical oxidation (ISCO) interventions.
Result:

  • Treated water consistently below legal limits for re-injection.
  • Reduction of solvent concentrations in environmental matrices.
  • Direct contribution to the sustainable redevelopment of the area.

Performance of the Plant

20 m3/h

TAF plant flow rate

7 barrier wells

Groundwater extraction system

ISCO

Interventions with permanganate in groundwater and unsaturated

The GEOSTREAM Solution

    • TAF (20 m³/h): groundwater treatment emitted from 7 barrier wells, with stripping section and re-injection to groundwater complying with the most stringent regulatory limits.
    • ISCO in groundwater: pilot injection of potassium permanganate-based oxidizing solution.
    • ISCO in the unsaturated: spraying of oxidant solution in excavations, with mechanical mixing to increase oxidant-soil contact.